Kmiainfo: Start to Finish Important material checklist for Residential & Commercial Construction Building

Below is a START-TO-FINISH IMPORTANT MATERIAL CHECKLIST
for Residential & Commercial House / Building Construction.
This is a MASTER CHECKLIST focusing only on key materials you must monitor carefully at each stage.


START TO FINISH : HOUSE / BUILDING CONSTRUCTION : IMPORTANT MATERIAL CHECKLIST (Residential & Commercial) :::----

🔹 STAGE 1: PRE-CONSTRUCTION & SITE SETUP ::----

Essential Materials :-
⬜ Temporary electric DB, cables
⬜ Temporary water supply pipes
⬜ Safety boards, barricading
⬜ Survey markers & layout strings.

Focus: Safety, access, accuracy.

🔹 STAGE 2: FOUNDATION & FOOTINGS ::----

Critical Materials :-
⬜ Cement (approved brand & grade)
⬜ Sand (clean, well graded)
⬜ Aggregate (20mm / 40mm)
⬜ TMT steel bars (correct diameter)
⬜ Binding wire
⬜ Cover blocks
⬜ Anti-termite chemical.

Focus:
✔ Steel quality
✔ Concrete mix
✔ Proper curing.

🔹 STAGE 3: PLINTH & BACKFILL ::----

Materials :-
⬜ Selected backfill soil / sand
⬜ Plinth beam concrete
⬜ Waterproofing compound
⬜ Underground plumbing pipes
⬜ Sleeves for services.

Focus: Compaction & moisture protection.

🔹 STAGE 4: RCC STRUCTURE (FRAME) ::----

Materials :-
⬜ TMT steel (columns, beams, slab)
⬜ Cement, sand, aggregate
⬜ Shuttering plates & supports
⬜ Release oil
⬜ Electrical & plumbing sleeves.

Focus:
✔ Steel as per drawing
✔ Vibration during concrete
✔ Curing (14 days).

🔹 STAGE 5: BRICK / BLOCK WORK ::----

Materials :-
⬜ Bricks / AAC blocks
⬜ Cement & sand for mortar
⬜ Lintels
⬜ Wall ties
⬜ Scaffolding materials.

Focus: Alignment, wall thickness, curing.

🔹 STAGE 6: PLUMBING (CONCEALED) ::----

Materials :-
⬜ Water supply pipes (CPVC / PPR / GI)
⬜ Drainage pipes (UPVC / SWR)
⬜ Pipe fittings
⬜ Valves (ball, angle, NRV)
⬜ Floor traps, P-trap / S-trap
⬜ Vent pipes.

Focus:
✔ Proper slope
✔ Pressure & leakage test.

🔹 STAGE 7: ELECTRICAL (CONCEALED) ::----

Materials :-
⬜ PVC / GI conduits
⬜ Junction & switch boxes
⬜ Copper wires
⬜ Earthing wire
⬜ Distribution board boxes.

Focus:
✔ Proper routing
✔ Earthing continuity.

🔹 STAGE 8: ROOF & WATERPROOFING ::----

Materials :-
⬜ Waterproofing membrane / chemical
⬜ Screed concrete
⬜ Rainwater pipes
⬜ Terrace insulation (if any).

Focus: Pond test mandatory.

🔹 STAGE 9: PLASTERING ::----

Materials :-
⬜ Cement & sand
⬜ Mesh at joints
⬜ Corner beads
⬜ Curing pipes & sprinklers.

Focus: Flatness & curing.

🔹 STAGE 10: FLOORING & WALL TILING ::----

Materials :-
⬜ Floor tiles / stone
⬜ Wall tiles
⬜ Tile adhesive
⬜ Spacers
⬜ Grout.

Focus: Level, alignment, slope in wet areas.

🔹 STAGE 11: DOORS & WINDOWS ::----

Materials :-
⬜ Door frames & shutters
⬜ Window frames & glass
⬜ Hardware (hinges, locks)
⬜ Sealants.

Focus: Alignment & smooth operation.

🔹 STAGE 12: ELECTRICAL FINAL FIX ::----

Materials :-
⬜ Switches & sockets
⬜ Light fixtures
⬜ Fans & exhaust fans
⬜ MCB / RCCB / RCBO
⬜ DB accessories.

Focus: Safety devices & labeling.

🔹 STAGE 13: PLUMBING FINAL FIX ::----

Materials :-
⬜ Sanitary fixtures (WC, basin)
⬜ Taps, mixers, showers
⬜ Kitchen sink
⬜ Overhead water tank
⬜ Pumps & controllers.

Focus: No leakage, good flow.

🔹 STAGE 14: PAINTING & FINISHING ::----

Materials :-
⬜ Wall putty
⬜ Primer
⬜ Interior paint
⬜ Exterior paint
⬜ Sealants & fillers.

Focus: Surface prep & uniform finish.

🔹 STAGE 15: FINAL HANDOVER ::----

Materials & Documents :-
⬜ Electrical test reports
⬜ Plumbing test reports
⬜ As-built drawings
⬜ Warranty cards
⬜ Spare materials.

🔑 MOST IMPORTANT MATERIALS TO MONITOR CLOSELY ::----
1. Cement
2. Steel
3. Waterproofing materials
4. Plumbing pipes
5. Electrical wires
6. Sanitary fixtures.

GOLDEN RULE FOR HOMEOWNERS & SUPERVISORS ::----
Right material + right stage + right inspection = quality building.